Manufacturing
Transfer to production is where most hardware projects stall. We do the unglamorous work: supplier vetting, DFM, panelisation, test fixtures, and ramp — so a prototype turns into a product that ships at the price you priced it at.
What is Manufacturing?
Manufacturing is the process of converting a validated design into finished products at the volume the business needs. It involves part sourcing, tooling, assembly, test, packaging, and the operational discipline that keeps yield, cost, and quality where the spec said they would be. We treat manufacturing as a continuation of engineering, not a separate phase — the design choices made on rev 1 of a PCB or a plastic part determine how cheaply and reliably the product can ever be made.
Pre-Production Planning
Pre-production planning is where the project becomes manufacturable. We finalise the bill of materials with second-source parts wherever they exist, lock tolerances on every mechanical part, generate the tooling drawings, plan the panelisation of the PCB, design the in-circuit and functional test fixtures, and write the assembly work instructions. We also sequence the supply chain — long-lead-time parts, custom tooling, and certification dependencies are mapped against the launch date. The goal is to enter production with the schedule already de-risked.
Production and Assembly
During production we coordinate with the contract manufacturer (CM) on first-article inspection, pilot build, and ramp. The first hundred units are scrutinised line-by-line for assembly defects, parametric drift, and operational failures. Test data is captured on every unit and reviewed at the end of each shift. By the time the line ramps to thousands of units a week, the process has been measured, adjusted, and locked.
Quality Control and Testing
Quality is what you measure, not what you hope for. Every product we build through manufacturing has a written test specification: in-circuit test on the PCB, functional test on the assembled unit, environmental burn-in for connected and battery products, and final-package inspection. We work with the CM's quality team to track yield by failure mode, root-cause every drop below the threshold, and continuously improve the process. A 99.5%+ first-pass yield at production is achievable on most designs — and is the difference between a profitable product and a margin-eating one.
Logistics and Distribution
The last mile of manufacturing is logistics: packaging, labelling, certification documentation, freight, customs, and warehouse handoff. Done well, it is invisible. Done poorly, it shows up as a launch delay, an export hold, or a customer who got the wrong unit. We help our clients design packaging that protects in transit, label that meets every regional requirement, and a logistics flow that scales from the first 100 units to the first 100,000.
How We Move Projects to Production
- Selecting CMs by capability fit, not by lowest quote — wrong CM = doubled launch time
- Authoring the test specification at design time so DFT is not a retrofit
- Engineering on-site at first-article and ramp — not just a phone call
- Yield tracking and continuous improvement during the first six weeks of production
- Documentation that the CM can run with: assembly drawings, BOMs, test instructions, FAI reports